Special Price
DIY翻新入門首選|83折精選價
$ 514.00
2-Day Delivery
500+ Sold
Color
Packing Spec7 in 1 Set
Country of Origin China
Description

Anti-Viral 150 Square feet redecoration DIY Set contains :
1. Nippon Paint Anti-Viral Odour-less Kids Paint 1L x 2
2. Nippon Paint Odour-less Color Sealer (Interior ) 1L x 1
3. 5" Premium All-in-One Paint Brush
4. Nippon Paint Paint Stirrer x 1
5. Nippon Paint Plastic Paint Tray x 1
6. Nippon Paint 1" Multi-functional Brush x 1

Delivery / Return
  • The product will be delivered by HKTVmall 
    (More)
  • Sold by Nippon Paint
  • This product is non-returnable
Qty
  • Video
  • Description

  • Customer Review(s)

  • Q&A

  • From the same store

  • Frequently bought together

Video
  • 01.
Description

Features :
Ag+Anti-virus
Formaldehyde Abatement
First-grade Anti-stain
First-grade Anti-bacteria
Excellent Anti-fungus
Eco-sense
Nearly Zero VOC
Odour-less, Eco-friendly
Cover Hairline Cracks
Excellent Washability


Theoretical Coverage: 13-14 (m2/L/coat)
No of Coat Recommended: 2 coats
Diluent: Clean Water
Dilution Rate: 10-20% (Adjustment depends on application method)
Drying Time - Touch dry: 60 minutes (at 25-30ºC)
Drying Time - Recoating: At least 2-3 hours (at 25-30ºC)
Packing: 1 Litre, 4.5 Litres
Finish: Matt
*The information given applies to the product and its performance under specific test conditions. The actual data may vary slightly depending on the application conditions, methods, and surface conditions.


Applicable substrate: wall and ceiling in total of about 150 feet.

[DIY Painting tips in 1 second]
 Use a mild detergent to clean the surface for painting. (if there are wall problems, please read on)
 Use Nippon Paint Adhesive Tape/ Nippon Paint Masker Tape to cover and protect the surface that is not going to conduct the painting system.
 Apply 1-2 coats of primer to the ceiling/wall with Nippon Paint 9 inch Good Quality Roller.
 Add 10-20%, not more than 30%, to dilute the paint to be used.
 Use Nippon Paint 9 inch Good Quality Roller to apply the top coat in the "W" method/"Z" method.
 Paint the ceiling/wall slowly and carefully.
 When the topcoat is half-dry, slowly remove the Nippon Paint Adhesive Tape used to protect doors, windows, and footing.

*** Please keep reading for details information ***

【Step 1: Prepare the surface to be constructed】
First of all, it is necessary to ensure that the construction surface is clean, dry and free of loose substances:
i) If there are stains, wipe with a mild detergent.
ii) If the old paint film becomes loose, use a paint spatula to remove it thoroughly.
iii) If there is rust or loose old paint film, use a wire brush to remove it.
iv) If there are nail holes or unevenness, use Nippon Paint Odour-less Wall Putty to fill in and smooth it.
v) If there is mildew, it needs to be thoroughly removed with Nippon Paint Anti-fungus Solution.
** Please apply in sunny and dry weather. Paint should not be applied in wet weather (relative humidity higher than 85%), which will affect the quality of the paint film.
** Keep indoor air circulation during construction and keep away from fire.

【Step 2: Prepare construction tools and protective clothing. 】
That is, Nippon Paint 9 inch Good Quality Roller, Nippon Paint Adhesive Tape, Nippon Paint Masker Tape ; also remember to prepare a bucket, ladder, newspaper, paint spatula, clean cloth, mask, gloves and Apron etc.
i) You can use old newspapers or Nippon Paint Adhesive Tape/Nippon Paint Masker Tape to cover furniture, floors, doors and windows, anchor lines, etc., to avoid contamination.
ii) Before construction, please wear protective clothing such as masks, gloves, hats, etc.

【Step 3: Apply 1 coat of primer first, then 2 top coats】
When you are ready, you can start painting!
i) Use a small Nippon Paint - 1" Silky Brush to paint the door and window sides, and then use the Nippon Paint 9 inch Good Quality Roller for large-scale construction.
ii) Apply 1-2 coats of primer with Nippon Paint 9 inch Good Quality Roller. It is recommended to start with the ceiling, then the wall, in the order of top-down.

** After applying the first layer of primer, please wait for 2-3 hours until it is completely dry, then you can apply the second layer of primer/start to apply the topcoat.
ii) Then apply 2 coats of top coat. (Note: For brighter colors, 3 to 4 coats may be required.)
Use a bucket to pour the amount of topcoat you need, and then add 10-20% (depending on the actual construction situation), not more than 30% of the water to dilute. Then start painting the top coat on the surface of the room that needs to be constructed.
** If you use brush: You can refer to the 1:08-1:18 method in the movie.
** If you use Roller: You can refer to the 1:19-1:35 technique in the movie.
** After applying the first top coat, wait for 2-3 hours to dry before applying the second top coat.
iii) Finally, before the second/last top coat is completely dry, slowly remove the Nippon Paint Adhesive Tape used to protect doors, windows, and footings to reduce the chance of tearing off together with the paint film and keep it beautiful.
Cleaning tools:
After painting, please wash the tools immediately with clean water; the undiluted paint can be sealed and stored in a cool and dry place (0-35℃) for future repair.

*** Soft Reminder ***
Remember not to pour leftover paint into the drain casually, as this will cause environmental pollution. If it is necessary to dispose of it, it is recommended that you pour the leftover paint on the old newspaper and dispose of it after it has dried.

*All colors shown on our website are strictly for your reference only, as different resolutions or settings of individual monitor may affect the presented colors. All colors are subject to the original paint color. If needed, you may also refer to the product color card. To request a color card, please register and request it on Nippon Paint's website.

All user comments
Has Images
Replied
Recently Viewed Products
 / Total  Pages )
Nippon Paint
4.5

Remarks

請注意, 立邦油漆所有已調色的油漆及產品, 均不可以退換及退錢.

About Nippon Paint

Nippon Paint, the largest paint manufacturer in Asia. It was established in Tokyo by Mr. Moteki Jujiro in 1881, Nippon Paint pioneered the first paint plant in Japan and has developed as the world's leading international paint manufacturer. Capturing "INNOVATION, SERVICE, LEADERSHIP" as the three key principles, we visualize a rewarding future by harmonizing people, nature and society which is always the company's main theme. Established since 1970, Nippon Paint (H.K.) Co., Ltd. has a team of experienced sales and marketing staff in Decorative and Architectural coatings. Over the years, the company has secured a wide range of projects comprising luxury private residential apartments, hi-tech commercial buildings, heavy duty structural steel work, public housing estates and public works.

 

As a caring company, environment protection is always considered from the beginning of production process until the finished products. Nippon Paint environmental innovative products not only protect the environment, but also maintain high quality which ensures customers to enjoy the environment and quality of life.

T & C

• Our store will protect your personal information in accordance to the relevant provisions of the personal Data             Protection Act and in accords to HKTVmall Privacy Policies.
• In case of any dispute, the merchant will retain the right of final decision without prior notice.
• Colour shown may be slightly different from actual products.
• In situation where there are limitations, price, promotion offers and other marketing campaigns on the HKTVmall         may varies from retail stores, the terms and offers are only applicable to HKTVmall.

Delivery / Return

•Products will be delivered by HKTVmall, please refer to Shipping Information for more details.
•Actual delivery time depends on the products ordered and the shipping time of the particular merchants.
•Shipping time of this store: Monday to Friday, excluding Public Holiday
•All products are non-returnable.
•In the event of dispute, HKTVmall's decision shall be final and conclusive.